Tuesday, August 17, 2010

Monsoon Season


New record for rain in Anchorage: 37 days straight or some such... should have done this roof thing in May.

As I am want to do, I have complicated the re-roof with the need to put "cornices" on the north and south ends of this "Monopoly house ( the little green pieces from the 70's game)".

Here there is an 8" bump so I can re-sheath the roof with 7/16" and have an even 40 feet of length. And, of course, a proper overhang.

Sunday, August 1, 2010

Sliced Cucumber?


Taped, primed and textured the laundry room this week. As soon as the texture was dry, I tried out the "Sliced Cucumber" color. I like it.

Sunday, June 6, 2010

lefty-loosey, righty-tighty



Removed the left-hinged 34" fire-damaged door, and replaced it with a 36" right hinged door. This should allow larger pieces of furniture, and appliances access.

Sunday, December 20, 2009

Better off shed


Actually completed something on this project: a 12'x10' shed to relieve me of my $230.00 a month storage unit. Had an extra window from the house project, installed it on the East side of this tallish structure (used full length studs, and the 9' OSB siding). The window is over the area that will eventually be the "wax bench" for my skis.

Will trench and run power to it next summer when the ground thaws. House project updates to follow soon.

Monday, May 11, 2009

Keeper of the Flame

Putting the "Pro" in procrastination. I spent my sunny South Central Alaskan weekend thatching, sweetening and fertilizing the lawn. I also finally broke down and bought the grill I have been shopping for the last 12 months. I had waited for a sale for 12 months - it never went on sale.


I brought home the unbuilt box and was surprised to find a $40.00 cheaper price tag inside ( lower 48 pricing). I returned to the Home Depot the next day and was refunded.
I stopped by Costco on the way home from that transaction and bought two pounds of beef tenderloins: four two-inch thick steaks.
Steak, potato and blue-cheese dressing on greens... and yes that is a picnic table and a Chinet paper plate. Back to the house project shortly.








Thursday, April 23, 2009

Take a Header


























Here is the new living room window, again almond vinyl and casement argon filled thermopane. I really like the "bulky look" of these windows - probably why they were so cheap (less glass).

These old houses had two four foot wide windows on this wall - with the top plate of the wall supported by a center beam. I have opened this up to a 102" rough opening.

My chief advisor ( and investor) dad insisted on an upgraded header. This old house is 2x4 wall construction - the header is two 2x6's, on edge - the traditional header - but filling the gap between the two boards is a 1/2 " steel plate. This steel sandwich is bolted and construction cement glued. Should be plenty strong to resist the sag of a fully snow loaded roof.

Other notes: yep, that's dads new 1958 M38 Willy's jeep in the driveway. The 6 mil plastic ceiling seen here should be covered with 5/8" fire rated drywall by the end of this weekend.

Wednesday, April 1, 2009

Concrete Galoshes





















A few of my few followers of a certain age will appreciate the title...

It's not witchcraft, but these mixers of Portland cement, rock and sand have become known as "concretins". The gray matter that it takes to make a life of the gray matter is sometimes skewed.
Fortunately, I found some fairly well-grounded (pun intended) concrete sub-contractors. Three hours and a bunch of folding money, and I don't have to step over the trench in the kitchen and laundry room anymore. Money well spent.

The protrusions in the floor of the laundry room are the toilet flange, the floor drain - every laundry/mud room should have one, and the forced air heat duct for the new 1/2 bath. The aforementioned eruptions in the newly screed concrete may appear high, but there is more to come. A self leveling mortar and tiles should get us pretty close to leveling the drain and water closet ring.